WooCommerce reporting with upcoming delivery and pickup details. Get detailed info about your sales including delivery and pickup locations. See location based order details.
- Get order number, order items with quantity, customer details, delivery/pickup address, delivery/pickup date time on same page for orders to be delivered/picked up today or the date range searched by you, without clicking order details page for each order. (From V-2.0.0)
- Get detailed chart of how many of which product to be delivered/picked up for today, when and to which address/location with order number. (From V-2.0.0)
- Individual product quantity sales reports for each pickup points.
- Delivery area based individual product quantity sales report.
- Get number of quantity ordered per products for each pickup point / delivery area.
- Upcoming deliveries/pickups report creation for two upcoming calendar days.
- Delivery area based order filtering.
- Pickup point based order filtering.
- Create report based on order status(pending/processing/completed/on-hold) (from v-2.0.2)
- CSV export – pickup point based sales.
- CSV export – delivery area based sales.
Requirements
Leah Waring (verified owner) –
Brilliant to work with, really helpful and quick responses. We’ve been very happy with the service provided and would use again and recommend. Thanks for all of your help.
Matt (developer of verified owner) –
very good support. Sorted some issues with the plugin on our site. great work
Daniel Bryan (verified owner) –
Amazing plugin, stops me going through the hassle of manually creating delivery days for our drivers as it outputs each day into a csv file, support have been amazing making tweeks to suit my needs
Micaël Chevalley (verified owner) –
Nice product with perfect online Helpdesk, helpful do make it run and customize it in the way my client want to use it.
Eric Kinch (verified owner) –
This has been a very helpful companion with the WooODT plugin. The ByC support has been very helpful in addressing some requests for customization as well.
host (verified owner) –
Hi there. This is a very helpful add-on to the WooODT plugin. This plugin gives our manager a good overview of our deliveries/pickups. I needed some customisations of the plugin, these were quickly performed by the friendly ByC support team. THX 🙂
-Henrik
comemos77 (verified owner) –
This is a nice addition to the WooODT plugin since it saves you time by already showing you all the orders per delivery date.